Typical setups
| Job | Common choice |
|---|---|
| Bathroom remodel | 10 yard |
| Kitchen remodel | 15 to 20 yard |
| Basement finish or several rooms | 20 yard |
| New home construction | 30 to 40 yard with swaps |
Job sites
On new builds, place the container where the truck can reach it after the driveway is poured and before landscaping goes in. Ask about scheduled swaps so crews never wait. Keep the container away from storm drains and cover it on windy days, since loose packaging and insulation blow easily across the valley.
Remodels in older homes
Older homes in Boise’s North End and East End, and in downtown Nampa, may have plaster walls, lead-based paint and, in some materials, asbestos. Test before demolition and follow lead-safe practices. Plaster and tile are heavy; mention them so the company quotes the right allowance.
In newer Meridian homes, most remodel debris is drywall, cabinets, carpet and fixtures, which is lighter than plaster and tile but bulky. Taking cabinet doors off and breaking down boxes before loading saves a lot of space. Ask whether the company offers a smaller container for the end of the job, when packaging from new fixtures and appliances arrives.
Questions answered
Can drywall and wood go together?
Usually yes. Drywall offcuts, framing scraps and other wood are normally accepted together as mixed construction debris. Some builders still keep metal, cardboard and clean wood apart, since scrap metal has value and clean loads can cost less to dispose of, so ask the company whether a clean-load rate is available. Keep paint, adhesives and solvents out of the mix, and cover the container on windy days so packaging does not blow away.
Do I need a permit for a container on the street?
Possibly. In the Treasure Valley, a container in a public street may need approval from the city or the local highway district, depending on where you are. Ask the roll-off company who arranges it and how long it usually takes, and leave time for it before demolition starts. If you live in an HOA community, check its rules too, since many subdivisions limit where a container can sit and for how long.
Can I keep a container through a whole build?
Yes, with swaps. On new construction a 30 to 40 yard container is common, and the company hauls it away and brings an empty one as it fills, so crews are not left waiting. Ask about long-term pricing, how far ahead a swap needs to be booked and whether a smaller container is available for the finish stage. Agree on a spot the truck can reach throughout the build, well away from storm drains.
Where this container is available
Related guide: Where your debris goes in the Treasure Valley
Other repairs: Landscaping and yard projects · Garage and shop clean-outs · Fence and roof replacement after wind